Laserfiche WebLink
Table 2 <br />OPERATIONAL LOSSES <br />Evans #2 Pit <br />2007 and 2008 Plan Years <br />! l 1 . <br />Plan Year <br />2007 and 2008 <br />Month Amount of <br />Aggregate <br />Production <br />tons Water Lost <br />With Mined <br />Aggregate <br />acre-feet Water Used <br />for Dust <br />Control <br />acre-feet Total <br />Operational <br />Losses <br />acre-feet <br />April 100,000 2.94 0.08 3.02 <br />May 100,000 2.94 0.08 3.02 <br />June 50,000 1.47 0.08 1.55 <br />July 50,000 1.47 0.08 1.55 <br />August 50,000 1.47 0.08 1.55 <br />September 50,000 1.47 0.08 1.55 <br />October 50,000 1.47 0.08 1.55 <br />November 0 0.00 0.00 0.00 <br />December 0 0.00 0.00 0.00 <br />January 0 0.00 0.00 0.00 <br />February 0 0.00 0.00 0.00 <br />March 50,000 1.47 0.08 1.55 <br />Total 500,000 14.72 0.61 15.33 <br />Notes: <br />(1) Projected mining provided by Fremont Paving & Redi-Mix. <br />(2) Column (2) times 2000 times 4% divided by 62.4 divided by 43,560. <br />(3) Based on 25,000 gallons per month as provided by Fremont Paving & Redi-Mix. <br />(4) Equals the sum of Columns (2) and (3). <br />_ Deere B Ault Consultants 1 - - - - -- - - <br />- ...._,. .. ....... _.. _... ._.... - .. <br />nC 2/27,12.07