Laserfiche WebLink
Mark McLean <br />September 10, 2008 <br />Page 4 <br />dewatering of the site is discontinued, the pit would fill and cause additional depletions to the <br />stream system due to increased evaporation. Therefore, the $50,000 bond must continue to <br />be held with the Division of Reclamation, Mining and Safety to line or backfill the ponds if <br />dewatering is discontinued. <br />12. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill 89-181 Rules <br />and Regulations" adopted on February 4, 1992, the State Engineer shall determine whether or <br />not the substitute supply is of a quality to meet requirements of use to senior appropriators. As <br />such, water quality data or analysis may, be requested at any time to determine if the water <br />quality is appropriate for downstream water users. <br />13. Acceptance of these conditions shall be assumed unless a letter to the contrary is <br />received by this office, the Division Engineer (310 E. Abriendo, Suite B, Pueblo, CO <br />81004), and the Water Commissioner (John Van Oort, P.O. Box 148, Rye, Colorado <br />81069) within two weeks of your receipt of this letter. <br />Please contact Heidi Frey of this office or Kalsoum Abbasi in Pueblo at (719) 542-3368 if you <br />have any questions concerning this approval. <br />Sincerely, <br />Kevin G. Rein, P.E. <br />Chief of Water Supply <br />Attachments: Tables 1, 2, 3, 4A, 48, and 5 <br />cc: Steven J. Witte, Division 2 Engineer <br />John Van Oort, Water Commissioner, Water District 14 <br />Mark Morley, Stonewall Springs Quarry/Morley Companies <br />Division of Reclamation, Mining and Safety <br />DW/HCF:M-2000-41 08 Evans No 2.doc