Laserfiche WebLink
Page 1 <br />Section 4.03.1 <br />Interoffice MEMORANDUM <br />to: Joe Dudash (also by e-mail) <br />from: Byron G. Walker <br />cc: Dan Hernandez, Sandy Brown (both by e-mail) <br />subject: Bowie No. 2 Mine, Permit Number C-1996-083, Bowie Resources LLC, <br />Technical Revision No. 47, Hubbard Creek Vent Shaft and Incidental boundary <br />Change, Adequacy Review <br />date: April 4, 2007 <br />This memo is in response to your memorandum of April 4, 2007, same subject. Your request was <br />to look at the haul road design. This I have done, but added a little too. <br />Materials reviewed include your memorandum; the J.E. Stover & Associated, Inc letter of March <br />8, 2007, and the attached Application. <br />Extra Item 1. During the sinking of the last shaft at Foidel a lot of water was encountered. Foidel <br />had to obtain a construction dewatering permit from CDPHE. They routed the water through a <br />sedimentation pond. Thus the pond had to handle both surface runoff and mine water. See the <br />appropriate regs. <br />Extra Item 2. The last paragraph on page 2.05-38, 03/07, needs to be revised to "with the <br />exception of the Hubbard Creek Shaft topsoil stockpile". <br />Extra Item 3. Remember to make a buffer zone exemption. <br />Extra Item 4. If the excavated materials are going to be placed in the waste pile, how is the shaft <br />to be reclaimed?