Laserfiche WebLink
(c) if ponds are apart of the Reclamation Plan, outline the final shore configuration of <br />the ponds and shallow areas if the future land use is for wildlife. <br />(d) state the average thickness of replaced overburden by reclamation area or phase; <br />and <br />(e) state the average thickness of replaced topsoil by reclamation area or phase.