My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-11_HYDROLOGY - M2004078
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2004078
>
2008-09-11_HYDROLOGY - M2004078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:11 PM
Creation date
9/12/2008 11:40:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
HYDROLOGY
Doc Date
9/11/2008
Doc Name
April 2008 Groundwater Monitoring Results
From
Civil Resources
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Eric Scott <br />September 8, 2008 <br />Page 2 <br />7 <br />CIVIL RESTWRCES,LLC <br />• Secondary Drinking Water Standards (SDWS) were exceeded for sulfate in well CRMW09. The <br />sulfate concentration in CMW09 did not exceed the individual well baseline level. The remaining <br />SDWS parameters tested for did not exceed the SDWS. Additional parameter test results and the <br />summary of all laboratory analysis results are contained in the attached table. <br />Figure 1 shows the location of the monitoring wells and the groundwater elevations measured during the <br />April sampling event. Groundwater contours have been drawn on the figure also based on these <br />measurements. The hydraulic gradient is generally highest at the southeast comer of the project as it has <br />been in the past. There is a depression in the groundwater level at the dewatering sites and a mound in the <br />middle of the site. This has caused the hydraulic gradient to shift to a more westerly and northerly direction <br />at the site. The results of this sampling event are consistent with anticipated results when the GWSAP was <br />developed. Further sampling will be completed in July consistent with the approved GWSAP. <br />Please contact me if you have any questions. <br />Sincerely, <br />CIVIL RESOURCES, LLC. <br />Joseph A. Jesik, PE <br />Civil Engineer <br />BDenverwater-1511LL Environmental1P008 DMG Sampling\Apr 08 SamplinglApM08- Itrrpt.doc
The URL can be used to link to this page
Your browser does not support the video tag.