Laserfiche WebLink
• • Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 <br />Results - replace Postmine Channel YPM-13 design SEDCAD4 demonstration, pages 13-12.3-143 -13-12.3-143H <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 <br />Results - replace Postmine Channel YPM-17 channel design, page 13-12.3-178 -13-12.3-181 <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 <br />Results - remove Postmine Channel YPM-6 System (Option 1) SEDCAD demonstration, pages 13-12.3-250 - 13- <br />12.3-295 (dated 02/08) <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel SEDCAD4 <br />Results - insert Postmine Channel YPM-24 SEDCAD demonstration, pages 13-12.3-250 -13-12.3-262 (dated <br />08/08) <br />• Attachment 13-12, Drainage and Sediment Control Plan, Appendix 13-12.1, Sediment Pond SEDCAD4 Results - <br />replace Exhibit 13-12.1A, Permanent Channel and Pond Watersheds <br />Vol 6B, TAB 13, Facilities <br />• Attachment 13-12A, As-Built Report Sediment Structure Pond 012 - replace existing attachment slip sheet and <br />insert new introduction <br />• Attachment 13-12A.1, Pond 012 As-Built Report, Part I Postmine Storage Capacity Addendum - remove Part I in <br />it's entirety <br />• Attachment 13-17, As-Built Report Sediment Structure Pond 014 - replace introduction page (dated 02/08) <br />• Attachment 13-17.1, Pond 014 As-Built Report, Part I Postmine Storage Capacity Addendum - replace page 13- <br />17.1-1 and 13-17.1-5 <br />• Attachment 13-19, As-Built Report Sediment Structure Pond 011A - replace existing attachment slip sheet and <br />insert new introduction <br />• Attachment 13-19.1, Pond 011A As-Built Report, Part I Postmine Storage Capacity Addendum - insert new <br />attachment behind the Attachment 13-19 introduction <br />• Attachment 13-19.2, Pond 011A As-Built Report, Part II Pond As-Built Report (September 2004) - insert new slip <br />sheet at the beginning of the as-built report (certification of 09/04) <br />Vol 9 TAB 20, Bacldill and Grading <br />• Text - replace text page 9 <br />• Attachment 20-1, Permanent Structures and Features, Attachment 20-1.2, Permanent Pond Demonstrations - <br />replace Attachment 20-1 text; retain Appendix 20-1.1, Land Owner Letters; replace Appendix 20-1.2, Permanent <br />Pond Demonstrations <br />• Exhibit 20-2, Postmining Topography Map - replace existing exhibit <br />• Exhibit 20-2B, Postmining Channel Profiles (2 sheets) - replace existing exhibit (2 sheets) <br />•