Laserfiche WebLink
GAULT GROUP INC. "'- <br />CREATING PARADIGMS IN RESOURCE MANAGEMENT <br />EcaVED <br />August 22, 2008 r <br />SEP 0 4 2000 R E7,11V. <br />Mr. Russ Means Division of Declamation, `? <br />tyL/ AUG 2 5 2008 <br />Division of Reclamation Mining and Sytw(150 <br />GRAND 3l1Paw ; << 1, :; :s.L/ OFFICE <br />101 S. 3rd St. Suite 301 DIVIS10tj OF <br />Grand Junction, CO. 81501 RECLAIMAVON TWNING & SAFETY <br />1/ 1/ Ll? <br />Re: J-Bird Mine, Permit No. M-2005-050, Technical Revision, Storm-Water Management Plan, <br />TR-0 1, Review, Response. <br />Dear Mr. Means, <br />This communication is in reference to the Notice of Designated Mining Operation sent by <br />DRMS to B1ueRock Energy Corp., (BREC) dated August 6d', 2008. An Environmental <br />Protection Plan (EPP) is required due to this Uranium Mine being defined as a Designated <br />Mining Operation (DMO) under House Bill 1161. On behalf of BREC, Gault Group Inc. (GGI), <br />requests response for the J-Bird Storm-Water Management Plan, TR-01, be addressed in the <br />EPP. A draft response has been crafted and awaiting review from GGI staff Engineer. This <br />additional time will allow for appropriate review, on-site implementation and opportunity to <br />demonstrate effectiveness during events. These actions will occur while development of the EPP <br />is in process therefore, reducing further potential Technical Revisions. If requested by DRMS <br />staff, the aforementioned draft response will be submitted by GGI as proof of progress to meet <br />the Extension Request GGI mailed to DRMS dated June 30`h, 2008. <br />Thank you, <br />Michael Quinlan <br />Project Scientist <br />Gault Group Inc, <br />2200 E. CAMELBACK ROAD, SUITE 2 1 7 36 WEST MAIN STREET <br />PHOENIx,. ARIZONA 8501 6 CORTEZ, COLORADO 81 32 1 <br />602/294-6652 FAx 602/294-6659 970/565-1222 FAX 970/565-1-22-6