Laserfiche WebLink
6 Form 2 (Public File) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Impacted topsoil will be minimal. Topsoil depth ranges between 0 - 12 inches over caprock. It is not <br />anticipated that topsoil will have to be removed. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill cuttings will be put back into the drill holes upon abandonment. Each hole will be plugged to <br />allow for two feet or concrete and a foot of surrounding material (dirt,sand) as indicated in 6-J, no <br />water is anticipated in the holes. If water does occur, measures noted in the rules shall be complied <br />with. - <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Not Applicable <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Pre-existing roads and pre-existing disturbed areas will be used for this project and, thus, <br />are not counted toward disturbed acreage.