Laserfiche WebLink
3 <br />Form 2 (Public File) <br />C. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which. locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes -/ No <br />E. Specify the Land Management Agency, Address and Telephone Number: <br />US. Department of the Interior-Bureau of Land Management <br />Montrose Field Office <br />2465 S. Townsend Ave <br />~Montrose, CO 81401 970-240-5300 <br />F. The prospector is required to document that the NO.I has been sent to the BLIbI or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NO.I.for BUM Land <br />Evidence of notification is attached to this NO.I for USFS Land. <br />Other proof of notice is attached to this NOI <br />If. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />I , identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2, includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes die location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. <br />III PROJECT DESCRIPTION <br />Mineral(s) and/or Resource(s) being Investigated: _..._UraniumNanadium <br />2. Cstimated dates of commencement and completion: <br />Commencement: 15 working days from date of submittal <br />Completion: 45 days from startup <br />3. Amount of material to be extracted, moved or proposed to be moved: 30.2 cubic yards extracted <br />4. Identify the type or method of prospecting proposed and quantity (place an "X") <br />-Cuts ?pPits Trenches <br />Shafts _ Tunnels Adits Declines <br />v .. Air Drilling _,--___ Fluid Drilling -.Tilling & Blasting