Laserfiche WebLink
7. QUALITY ASSURANCE/QUALITY CONTROL <br />During the project QA/QC field book checks will be conducted by the designated <br />project representatives. Any corrective action must be conducted in writing by <br />the owner of the Note book and initialed by the QA/QC representative. <br />9. DATA AND RECORDS MANAGEMENT <br />During the project QA/QC field book checks will be conducted by the designated <br />project representatives. Any corrective action must be conducted in writing by <br />the owner of the Notebook and initialed by the QA/QC representative. <br />9. REFERENCES <br />EPA, March 2001, Guidance for Preparing Standard Operating Procedures <br />(SOPs) EPA QA/G-6, EPA/240/B-02/004, Office of Environmental Information, <br />Washington, D.C. <br />EPA, March 2001, EPA Requirements for Quality Management Plans, EPA A/R- <br />2, EPA/240B-02/002, Office of Environmental Information, Washington, D.C. <br />EPA, Nov ember, 2002, Guidance on Environmental Verification and Data <br />Validation, EPA QA/G-8, EPA/240/R-02/004, Office of Environmental Information, <br />Washington, D.C. <br />EPA, December 2002, Guidance for Quality Assurance Project Plans, EPA <br />AQ/G-5, EPA/240/R-2/009, Office of Environmental Information, Washington, D.C. <br />Powertech R Squared Inc <br />Attachment A