My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/21/2008
Doc Name
Additional needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Operating Procedure 56.0 <br />Note Taking and Log Book Entries <br />TABLE OF CONTENTS <br />1. PURPOSE AND SCOPE <br />The Standard Operating Procedure (SOP) provides technical guidance and <br />procedures that will be employed during all field activities. The procedure <br />addresses how, and when data will be recorded in the field. <br />2. RESPONSIBILITIES AND QUALIFICATIONS <br />All team members are required to comply with the SOP. The designated team <br />leader will be responsible for ensuring the SOP is followed. <br />3. DATA QUALITY OBJECTIVES <br />Field Activity Requirements <br />4. RELATED STANDARD OPERATING PROCEDURES <br />Pertains to all field documentation activities <br />5. EQUIPMENT LIST <br />Permanently bound log book (no spiral-bound log books) <br />Black or blue ballpoint pen (waterproof ink) <br />6. PROCEDURES <br />1. Use black or blue ballpoint pen with waterproof ink. Felt-tip pens should not be used. <br />2. Reserve the inside front cover for business cards from key personnel who visit the site (including <br />the person in charge of the log book). <br />3. On the first page of the log book, place a return for reward notice, phone number, and the Project <br />manager's name. <br />4. Enter the following on the second page of the log book: project name, project number, Team <br />Leader name, onsite contacts, onsite telephone number and address, telephone numbers for all <br />key personnel, and emergency fire and medical telephone numbers. <br />Powertech R Squared Inc <br />Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.