My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/21/2008
Doc Name
Additional needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 22.0 Purging and Sampling Monitoring Well <br />1.0 PURPOSE AND SCOPE <br />This Standard Operating Procedure (SOP) describes the method by which a groundwater <br />monitoring well is to be evacuated and sampled to obtain a representative sample of formation <br />water. Wells are purged to remove stagnant water from the casing but excessive purging can also <br />yield non-representative results. Wells with slow recovery rates create a logistical problem <br />because of the time required for purging. Wells with slow recovery rates (low-yield) create a <br />logistical problem because of the time required for purging; where as a high-yield well is defined <br />as one in which the water level recovers almost immediately after water is removed. The <br />procedure addresses the types of equipment, field purging and sampling procedures, field data <br />collection and personnel responsibilities needed to ensure representative data. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The project manager or their designated representative will be responsible for implementing this <br />SOP. <br />3.0 EQUIPMENT LIST <br />• Teflon bailer/ pump (Grundfos or ProActive) <br />• Tubing for pump <br />• Nylon rope for bailer <br />• Water level indicator <br />• Water quality meter (YSl 556) to collect the following field parameters: temperature, <br />conductivity, pH, oxygen-reduction potential and dissolved oxygen. <br />• Sample bottles/ 40-m1 vials <br />• Knife <br />• Sample gloves <br />• Paper towels <br />• Waste containers (gallon jug and trash bag) <br />• Pump and suction hose <br />4.0 RELATED S' <br />SOP No. 6.0 <br />SOP No. 8.0 <br />SOP No. 10.0 <br />SOP No. 20.0 <br />SOP No. 21.0 <br />SOP No. 32.0 <br />fANDARD OPERATING PROCEDURES <br />Water Table Elevation <br />Field Equipment Calibration <br />Decontamination of Sampling Equipment <br />Sample Shipping Methods <br />Well Recovery Rate Determination <br />Well Casing Volume Determination <br />4/23/07 Page I of 7 R Squared Inc. <br />Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.