My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/21/2008
Doc Name
Additional needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 10.0 Decontamination of Sampling Equipment <br />6.0 DOCUMENTATION <br />Documentation of observations and data acquired in the field will provide information on the <br />activities concluded and also provide a permanent record of field activities. The observations <br />and data will be recorded with waterproof ink in a permanently bound weatherproof field <br />logbook with consecutively numbered pages. <br />Sampling personnel will be responsible for documenting the decontamination of all sampling <br />equipment. The information entered in the field book concerning decontamination should <br />include the following: <br />• Decontamination personnel <br />• Date and start and end times <br />• Decontamination steps/observations <br />• Weather conditions <br />7.0 QUALITY ASSURANCE/QUALITY CONTROL <br />During the project the designated project representatives will conduct QA/QC field book checks. <br />Any corrective action must be conducted in writing by the owner of the Note book and initialed <br />by the QA/QC representative. <br />8.0 INSTRUMENT CALIBRATION AND STANDARDIZATION <br />Not applicable. <br />9.0 REFERENCES <br />EPA, March 2001, Guidance for Preparing Standard Operating Procedures (SOPs) EPA QA/G-6, <br />EPA/240B-02/004, Office of Environmental Information, Washington, D.C. <br />EPA, March 2001, EPA Requirements for Quality Management Plans, EPA A/R-2, EPA/240B- <br />02/002, Office of Environmental Information, Washington, D.C. <br />EPA, Nov ember, 2002, Guidance on Environmental Verification and Data Validation, EPA <br />QA/G-8, EPA/240/R-02/004, Office of Environmental Information, Washington, D.C. <br />EPA, December 2002, Guidance for Quality Assurance Project Plans, EPA AQ/G-5, <br />EPA/240/R-2/009, Office of Environmental Information, Washington, D.C. <br />4/23/07 Page 4 of 6 R Squared Inc. <br />Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.