My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:15:35 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/21/2008
Doc Name
Additional needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 10.0 <br />Decontamination of Sampling Equipment <br />1.0 PURPOSE AND SCOPE <br />This standard operating procedure (SOP) describes procedures that will be used for sampling <br />equipment decontamination. The collection of environmental samples requires that all <br />equipment associated with collecting these samples be cleaned. This requirement reduces the <br />possibility of contaminants being introduced into the sample from external sources. This <br />procedure establishes the cleaning and decontamination methods for achieving that goal. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The Project Manager or Field Manager has the overall responsibility for implementing this SOP. <br />They will be responsible for assigning environmental staff to implement this SOP and for <br />ensuring that the procedures are followed by all personnel. <br />All personnel performing these procedures are required to have the appropriate health and safety <br />training. In addition, all personnel are required to have a complete understanding of the <br />procedures described within this SOP and receive specific training regarding these procedures, if <br />necessary. <br />All environmental and assay laboratory staff are responsible for reporting deviations from this <br />SOP to the Project Manager or Field Manager. <br />3.0 RELATED STANDARD OPERATING PROCEDURES <br />The procedures for decontamination of sampling equipment set forth in this SOP are intended for <br />use with the following SOPs: <br />SOP No. 1.0 Surface Water and Seep Sampling <br />SOP No. 5.0 Monitor Well Installation <br />SOP No. 6.0 Water Level Measurements <br />SOP No. 8.0 Field Parameters Measurement (including instrument calibration) <br />SOP No. 9.0 Field Filtration Procedures <br />SOP No. 15.0 Well Development <br />SOP No. 26.0 Monitor Well Groundwater Sampling <br />SOP No. 30.0 Drilling and Sampling of Subsurface Materials <br />4/23/07 <br />Page 1 of 6 <br />R Squared Inc. <br />Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.