My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:13:34 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:54:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/12/2008
Doc Name
Needed items for NOI
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP No. 22.0 Purging and Sampling Monitoring Well <br />1.0 PURPOSE AND SCOPE <br />This Standard Operating Procedure (SOP) describes the method by which a groundwater <br />monitoring well is to be evacuated and sampled to obtain a representative sample of <br />formation water. Wells are purged to remove stagnant water from the casing but <br />excessive purging can also yield non-representative results. Wells with slow recovery <br />rates create a logistical problem because of the time required for purging. Wells with <br />slow recovery rates (low-yield) create a logistical problem because of the time required <br />for purging; where as a high-yield well is defined as one in which the water level <br />recovers almost immediately after water is removed. The procedure addresses the types <br />of equipment, field purging and sampling procedures, field data collection and personnel <br />responsibilities needed to ensure representative data. <br />2.0 RESPONSIBILITIES AND QUALIFICATIONS <br />The project manager or their designated representative will be responsible for <br />implementing this SOP. <br />3.0 EQUIPMENT LIST <br />• Teflon bailer/ pump <br />(Grundfos or ProActive) <br />• Tubing for pump <br />• Nylon rope for bailer <br />• Water level indicator <br />• Water quality meter (YSI 556) to collect the following field parameters: <br />temperature, conductivity, pH, oxygen-reduction potential and dissolved <br />oxygen. <br />• Sample bottles/ 40-m1 vials <br />• Knife <br />• Sample gloves <br />• Paper towels <br />• Waste containers (gallon jug and trash bag) <br />• Pump and suction hose <br />4.0 RELATED STANDARD OPERATING PROCEDURES <br />SOP 6.0 Water Table Elevation <br />SOP 66.0 Well Development <br />SOP 8.0 Field Equipment Calibration <br />SOP 21.0 Well recovery rate determination <br />SOP 20.1 Sample Shipping Methods <br />SOP 52.0 Note Taking and Log Book Entries <br />SOP 10.0 Decontamination of Sampling Equipment <br />SOP 32.0 Well Casing Volume Determination <br />7/17/07 Page 1 of 9 <br />R Squared Inc.
The URL can be used to link to this page
Your browser does not support the video tag.