My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/3/2008, 9:12:17 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 9/3/2008, 9:12:17 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/3/2008 10:51:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
PERMIT FILE
Doc Date
8/25/2008
Doc Name
Response to 08/22/2008 letter
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP NUMBER 8.0 <br />Page 6 of 10 <br />Field Parameter Measurements <br />Furthermore, as described below a duplicate set of field parameter measurements will be <br />collected for every 10 sampling stations. <br />5.3.1 QC Checks and Acceptance Criteria <br />One duplicate field parameter measurement shall be collected for every ten sampling locations <br />(10% frequency). Field parameter measurements are considered satisfactory if the duplicate <br />measurements fall within the acceptable range in the table below. <br />Field Parameter Acceptable Range <br />pH + 0.1 H unit <br />Temperature +10% <br />Oxidation-Reduction Potential + 5 mV <br />Conductivity +10% <br />Turbidity ± 10% <br />Dissolved Oxygen + 0.1 mg/L <br />If duplicate acceptance criteria are not met, the instrument must be re-calibrated and new <br />parameter measurements obtained at the sample location where the original duplicate sample did <br />not meet acceptance criteria. <br />6.0 DOCUMENTATION <br />Documentation of observations and data acquired in the field will provide information on the <br />activities conducted and also provide a permanent record of field activities. The observations <br />and data will be recorded with waterproof ink in a permanently bound weatherproof field <br />logbook with consecutively numbered pages, and/or on field data sheets as appropriate. <br />6.1 FIELD LOGBOOK <br />All information regarding calibration of field instruments will be recorded in the field logbook. The <br />following information will be recorded in the field logbook: <br />• Type of meter calibrated and instrument manufacture (the instrument serial number should be <br />recorded at the start of work and if instruments are changed) <br />• Date of calibration <br />• Person(s) performing the calibration <br />• Calibration solutions used <br />• Results of calibration measurements <br />• Any deviations from the SOPS <br />6.2 FIELD NOTES <br />Powertech <br />4/23/2007 R Squared Inc <br />Rev SOP 8-1 JAB <br />8-6
The URL can be used to link to this page
Your browser does not support the video tag.