My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-02_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2008-09-02_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:01 PM
Creation date
9/3/2008 10:36:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/2/2008
Doc Name
Letter & Application and Public Notice
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR75
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 28, 2008 Recf-wo <br />Mr. James R. Stark 2008 <br />Environmental Protection Specialist S?? a 2 <br />Colorado Division of Reclamation, Mining and Safety zctamation, <br />Department of Natural Resources ?ivW,n?n vn9 and Safety <br />1313 Sherman Street, Room 215 rA? <br />Denver, CO 80203 <br />RE: Technical Revision No. 75, South Taylor Section 28 and 29 Collection Ditch Redesign and <br />Exhibit 7, Item 20, Part D Update, Colowyo Coal Mine, Permit No. C-81-019. <br />Dear Mr. Stark, <br />Enclosed please find two copies of materials provided for Technical Revision No. 75. This change updates <br />the permit to include the redesign of the Section 28 and 29 Collection Ditches of the South Taylor/Lower <br />Wilson expansion. The original ditches were found to be impractical due to topographical constraints and <br />consequently new ditch designs were required. These new designs change the horizontal and vertical <br />alignment of the collection ditches, which will allow the ditch to avoid natural landslide areas. <br />The update to Exhibit 7, Item 20, Part D: Temporary Channel Design, reflects the changes to the Section 28 <br />Collection Ditch and revises the length of the Section 29 Collection Ditch, from 3100 feet to 2624 feet, to <br />correct an error in the permit. <br />Both of these ditches will meet with the existing collection ditch surrounding the active mine area. <br />In response to review comments we have run SEDCAD calculations for both of the ditches and have also <br />provided engineering designs. <br />Also included with the revision package are an application form, the public notice and an index sheet. <br />If you have any questions or require additional information, please feel free to contact me at (970) 824-1529. <br />Sincerely, <br />ifer Sekulski <br />Environmental Engineer <br />Encl. 2 copies <br />Cc: file CF 1.1.2.64
The URL can be used to link to this page
Your browser does not support the video tag.