Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />-Developed-Water Resources(WR)_ <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): Material will be stockpiled <br />by a dozer or front end loader. These stockpiles will then be <br />loaded onto trucks for transport. <br />15. On Site Processing: None Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Pushed into stockpiles by dozer or <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: No ch em i c a 1 s <br />are used on site: fueling is done off-site. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This ien-enlarges thepit area from 9.2 to 14-16 ar-rp.--- This <br />PnIaraement encompasses all tbe land nwned by Lincoln County at this to