Laserfiche WebLink
BEFORE THE MINED LAND RECLAMATION BOARD <br />STATE OF COLORADO <br />DRAFT PRE-HEARING ORDER <br />IN THE MATTER OF THE SerFer Pit, 112 CONSTRUCTION MATERIALS APPLICATION, <br />FILE NO. M-2008-006. <br />The Mined Land Reclamation Board ("the Board"), through prehearing conference officer Sandra <br />Brown, and pursuant to Construction Materials Rule 2.7, conducted a prehearing conference on <br />August 20, 2008. The Board, having considered this order, as proposed by the prehearing <br />conference officer, and having considered any objections or comments from the parties, hereby <br />enters the following Pre-hearing Order for the captioned proceeding: <br />1. FORMAL PUBLIC HEARING <br />The Formal Public Hearing on this matter (unless noticed otherwise) is scheduled for September <br />10-11, at the Centennial Building, 1313 Sherman Street, Room 318, Denver, Colorado 80203, <br />during the Board's September 2008 meeting. The Board's agenda (unless noticed otherwise) will <br />begin at 9:00 a.m. each day. <br />II. PARTIES <br />APPLICANT <br />Connell Resources, Inc. <br />7785 Highland Meadows Parkway, Unit A <br />Fort Collins, CO 80528 <br />Applicant Consultant: <br />Applegate Group, Inc. <br />1499 W. 120th Avenue, Suite 200 <br />Denver, CO 80234 <br />OBJECTOR <br />Colorado Department of Transportation <br />Attn: Gary Dewitt <br />Region 4, Materials Engineer <br />3971 W. Service Road <br />Evans, CO 80620