My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-14_REVISION - M1987038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987038
>
2008-08-14_REVISION - M1987038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:56 PM
Creation date
9/3/2008 7:53:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
REVISION
Doc Date
8/14/2008
Doc Name
Amendment approval
From
DRMS
To
Oldcastle SW Group, Inc. dba Four Corners Materials
Type & Sequence
AM5
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST DIRECT COSTS) FORM FLEET <br /> <br />NO. <br />TASK DESCRIPTION <br />USED <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Reduce Highwall to 3.1 dozer 1 3.9 $667 <br />002 -Rip compaction in Disturbed area ripper 1 19.0 $3,319 <br />003 Replace topsoil on disturbed areas dozer 1 79.8 $13,341 <br />004 Removal and Disposal of Misc. Debris demolish 1 4.0 $375 <br />005 -Revegetation revege 1 19.7 $17,430 <br />006 -Mobilize/Demobilize mobilize 1 4.2 $1,157 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 130.8 $36,289 <br />a 1 iauvi au uainirm ui IVH /o TOTAL DIRECT COST' =I <br />36,289 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $733 <br />Performance bond : 1.05 % of direct total = $381 <br />Job superintendent : 65.42 hrs"...$/hr. $41.25 total = $2,698 <br />Profit : 10.00 % of direct total = $3,629 <br />"assume net hours = 5o% of task hours TOTAL O & P = $7,441 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $43,730 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : 4.25 % of Intr. NA total = $1,859 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $2,187 <br />CONTINGENCY - NA" NA total = NA <br />' contingencies accounted for at task level TOTAL INDIRECT COST = $11.986 <br />TOTAL BOND AMOUNT (direct + indirect) _ $48,275
The URL can be used to link to this page
Your browser does not support the video tag.