Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stock-piled and redistributed for the re-establislunent of <br />vegetation. Specify approximate topsoil redistribution depth: _ <br />Covet D?r+?l;,,. n. Del It Witt bL Sk&"tei in4a <br />0?0r t. &.-t e- of. 0. L drfIt . D'--R Will 6- IGK.lcA L f+k <br />Gywb • _pr•1,,?_.y rrwr PrlGtatl??+?r? P.yc,? G?_? <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />-%OleX 041 be o 1 A6,4doe,( itr vu6t s d . <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />GCtlf' r'OA?,t L?lrU ?Rv{ 0%?v.a•- ria.Q:v? 49 b? r''AS 44,1 <br />_ _!?1.1.:YJ_-_ ?G?IiG.-tl?r ?t.i`s o If?-i ?l !Cyp,p? •'?`y' ?S - - <br /> <br />r: 11 -?y.r a yl" ay'ea will In- errJtA -<z <br />??s, n. 14cA Pk