III. COMMENTS - COMPLIANCE <br /> Colowyo C-1981-019 <br /> 13 August 2008 4:2� <br /> Pg 1/4 <br /> Below are comments on the inspection. The comments include discussion of observations <br /> made during the inspection. Comments also describe any enforcement actions taken during <br /> the inspection and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection of the Colowyo Mine conducted by Jim Stark of CDRMS. <br /> The,inspection was conducted on 13, 14 and 15 August 2008. Jennifer Sekulski and <br /> Ryan Pawlowski of CCC accompanied me on all days of the inspection. The mine <br /> was actively mining coal and hauling coal to the loadout at the time of the <br /> inspection. The weather very hot and sunny and the ground was mostly dry on both <br /> days of the inspection. There was a large rain storm that passed through the mine <br /> over the previous weekend. <br /> Signs and Markers: - All of the necessary signs were in place as required at the time <br /> of the inspection. Mine ID signs were in place at the main entrance and at all of the <br /> ponds along Colorado Highway 13 as required. Colowyo has a mine identification <br /> sign at the access point (by the Sturgeon house) along Colorado Highway 13, which <br /> is the access point to the Section 28 Pond. <br /> Roads: - The mine access road and haul road to the Gossard Loadout is a paved <br /> road. The road was well maintained and in good condition. <br /> - The haul roads in the East and West pit areas were dry and appeared to be well <br /> maintained and stable at the time of the inspection. No erosional problems were <br /> noted on these roads. There was some dust on the roads but the operator was <br /> actively watering the roads. <br /> - The light-use roads around the Gossard Loadout and to the rail loop were dry and <br /> appeared to be well maintained and in good condition at the time of the inspection <br /> - The light-use roads in the East Pit reclamation area were all dry. There was some <br /> minor rutting and rilling but overall these roads appeared to be stable and were in <br /> good condition. These roads held-up well given the large amount of rain the mine <br /> received over the past weekend. <br /> - The road in Taylor draw (to the West Pit and East Ponds) was recently bladed up to <br /> the East Taylor Pond. There we some mud and water in a few of the low spots but <br /> overall the road was dry. The road appeared to be stable and was in overall good <br /> condition. No erosional problems were noted on the road. <br /> - The Sturgeon road work has been completed. This includes the blading, <br /> establishing the Missouri crossings and placing a gravel surface on the road. The <br /> road has been completed and surfaced to the Section 28 Pond. The road was well <br /> maintained and appeared to be stable at the time of the inspection. No erosional <br /> problems were noted on the road at the time of the inspection. <br />