My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-28_REVISION - X200822901
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200822901
>
2008-08-28_REVISION - X200822901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:56 PM
Creation date
8/29/2008 3:27:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200822901
IBM Index Class Name
REVISION
Doc Date
8/28/2008
Doc Name
Phase III Amendment Application
From
Hydro-Environmental Solutions
To
DRMS
Type & Sequence
AM2
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IOtlJl7J'LnnO 17: no ?tuo?ouuuc "`'" <br />9. No adverse impacts to my threatened or endangered species or their habitat that was <br />determined to be critical under the Endacgercd Species Act were identified. If, at a future time, <br />there could be the poteotW for adverse impacts, treatments would be modified or mitigated not to <br />have an adverse effect at new analysis would be conducted. <br />10. This altemative is in compliance with relevant Federal, State, and local laws, regulations, and <br />requirements for the protection of the environment. <br />DECISION AND RATIONALE: <br />I have determined that approving this Exploration License is in conformance with the approved <br />land use plan: It is my decision to implement the project-with the-attached=stipuldtions for <br />plugging of the exploration drill hales and timing stipulation for wildlife. The project will be <br />i monitored as stated in the Compliance Plan outlined below. <br />COMPLIANCE PLANS?: <br />Compliance Schedule <br />Compliance will be conducted during the drilling phase to insure that all terms and conditions <br />3 _ specified in the license are followed. After reclamation of the drill pads, an inspection will be <br />performed. <br />Assignment of Responsibility <br />Responsibility for implementation of the compliance schedule and monitoring plan will be <br />assigned to. the Solid Minerals staff in the Little Snare Field Office. The primary inspector will <br />be the Mining.-Engineer, but the Natural Resource Specialist may also be Involved. <br />SIGNATURE OF PREPARER: <br />DATE SIGNED: 0S?lf <br />t sicNATuRE OF ENVIRONIIENTAE REVIEWER: <br />DATE SIGNED: <br />CJ <br />Ok''ICIAL, <br />SIGNATURE OF AUTHORIZED <br />DATE SIGNED.
The URL can be used to link to this page
Your browser does not support the video tag.