My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-13_REVISION - C1981013 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2008-08-13_REVISION - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:29 PM
Creation date
8/27/2008 11:37:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
REVISION
Doc Date
8/13/2008
Doc Name
Proposed Decision & Findings of Compliance for SL6
From
DRMS
To
New Elk Coal Company
Type & Sequence
SL6
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A <br /> <br />Description Golden Eagle Bond R <br />Acres of liability elease Acreag <br />Achieved e Status - Curre <br />Achieved nt <br />Achieved <br /> Phase I Phase II Phase III <br />Main Facility 51.4 (SL01) 51.4 (SL-03) 51.4 0 <br />Ponds 3 and 4 5.6 0 0 0 <br />RR track 0.1 0 0 0 <br />NW-1 vent 1.2 (SL-04) 1.2 0 0 <br />Apache shafts (added in SL-02)1.15 (SL-05) 1 15 (SL-05) 1.15 (SL-05) 1.15 <br />Roads and pads 6.72 (SL-02) 6.72 (SL-02) 6.72 (SL-02) 6 72 <br />Totals 66.17 60 47 59.27 7 87 <br /> Table B <br />Description Acres of liability Achieved Achieved Achieved <br /> Phase I Phase II Phase III <br />Main Facility 51.4 (SL01) 51 4 (SL-03) 51 4 (SL-06) 51.4 <br />Ponds 3 and 4 5.6 (SL-06) 5.6 (SL-06) 5.6 (SL-06) 5.6 <br />RR track 0.1 (SL-06) 0.1 (SL-06) 0.1 (SL-06) 0.1 <br />NW-1 vent 1 2 (SL-04) 1.2 0 0 <br />Apache shafts (added in SL-02)1.15 (SL-05) 1.15 (SL-05) 1.15 (SL-05) 1.15 <br />Roads and pads 6.72 (SL-02) 6.72 (SL-02) 6.72 (SL-02) 672 <br />Totals 66.17 66.17 64 97 64 97 <br />Included in the Ponds 3 and 4 acreage are the river ponds (2) and pumphouse which <br />are approved to remain as permanent as a result of approval of Technical Revision No. <br />47. <br />Table C depicts the changes in required bond amounts due to previous bond releases <br />and two technical revisions that also modified the required bond amount. <br />Table C <br />Application Pre-release <br />liability Post-release <br />liability Comments <br />Phase I (SL-01) $1,153,959 $477,085 $676,874 released <br />Industrial (SL-02) $477,085 $365,595 $111,490 released <br />Phase II (SL-03) $365,595 $173,094 15% of $1,153,959 <br />TR-54 $173,094 $132,719 Bond reduction <br />TR-55 $132,719 $206,633.14 NW-1 increase <br />Phase I (SL-04) $206,633.14 $151,832.14 $54,801.00 released <br />Phase 1/II/III SL-05 $151, 832.14 $141, 892.49 $9,939.65 released
The URL can be used to link to this page
Your browser does not support the video tag.