Laserfiche WebLink
Table A <br />Description Acres of liability Achieved Achieved Achieved <br /> Phase I Phase II Phase III <br />Main Facility 51.4 (SL01) 51.4 (SL-03) 51.4 0 <br />Ponds 3 and 4 5.6 0 0 0 <br />RR track 0.1 0 0 0 <br />NW-1 vent 1.2 (SL-04) 1.2 0 0 <br />Apache shafts (added in SL-02)1 15 (SL-05) 1.15 (SL-05) 1 15 (SL-05) 1.15 <br />Roads and pads 6.72 (SL-02) 6.72 (SL-02) 6.72 (SL-02) 6.72 <br />Totals 66.17 60.47 59.27 7.87 <br /> Table B <br />Description Acres of liability Achieved Achieved Achieved <br /> Phase I Phase II Phase III <br />Main Facility 51.4 (SL01) 51.4 (SL-03) 51 A (SL-06) 51.4 <br />Ponds 3 and 4 5.6 (SL-06) 5.6 (SL-06) 5.6 (SL-06) 5.6 <br />RR track 0.1 (SL-06) 0.1 (SL-06) 0.1 (SL-06) 0.1 <br />NW-1 vent 1.2 (SL-04) 1.2 0 0 <br />Apache shafts (added in SL-02)1.15 (SL-05) 1.15 (SL-05) 1.15 (SL-05) 1.15 <br />Roads and pads 6.72 (SL-02) 6.72 (SL-02) 6 72 (SL-02) 6.72 <br />Totals 6617 66.17 64.97 64.97 <br />Included in the Ponds 3 and 4 acreage are the river ponds (2) and pumphouse which <br />are approved to remain as permanent as a result of approval of Technical Revision No. <br />47. <br />Table C depicts the changes in required bond amounts due to previous bond releases <br />and two technical revisions that also modified the required bond amount. <br />Table C <br />Application Pre-release <br />liability Post-release <br />liability Comments <br />Phase I (SL-01) $1,153,959 $477,085 $676,874 released <br />Industrial (SL-02) $477,085 $365,595 $111,490 released <br />Phase II (SL-03) $365,595 $173,094 15% of $1,153,959 <br />TR-54 $173,094 $132,719 Bond reduction <br />TR-55 $132,719 $206,633.14 NW-1 increase <br />Phase I (SL-04) $206,633.14 $151,832.14 $54,801.00 released <br />Phase 1/11/III (SL-05) 1 $151, 832.14 $141, 892.49 $9,939.65 released