My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-22_INSPECTION - M1984041
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1984041
>
2008-08-22_INSPECTION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:43 PM
Creation date
8/26/2008 3:21:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
INSPECTION
Doc Date
8/22/2008
Doc Name
Bond Calculation
From
DRMS
To
American Gypsum, LLC
Inspection Date
8/21/2008
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PMENT MOBILIZATION _I DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 10a State :Colorado Permit/job #:M-1984-041 <br />Date : 0812112008 County :Eagle Abbreviation :none <br />User : THM Site :Eagle - Gypsum Mine Filename :M041-10a <br />Permit or other job action : Final Reclamation Cost Update <br />Task description :Initial Mobilization to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons . <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour: , $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />u?u r?nn AOl C CA1110AACAIT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11- 8SU (20 52.55 $50.32 $125.45 2 $351.53 $250.90 $0.00 <br />-CAT 950G (2002) 19.52 $21.07 $88.67 4 $438.98 $354.68 $0.00 <br />-Cat 330C L 37.18 $45.61 $117.55 2 $326.32 $235.10 $0.00 <br />-Revegetation Tractor 10.00 $25.00 $88.67 2 $227.34 $177.34 _$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,344.17 $1,018.02 $0.00 <br />sheet 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.