Laserfiche WebLink
CIRCES Cost Estimating Software <br />sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task # : 004 State : Colorado Permit/job # M-1978-014 <br />Date : 0711112008 County :Jefferson Abbreviation : none <br />User : DB2 Site : Chieftain North Filename : M014-004 <br />Permit or other job action So <br />Task description : Mobe / Demobe -_ __-------- <br />- __.._ <br />__ <br /> Shift basis per day <br />EQUIPMENT TRANSPORT RIG COST <br /> Cost data source : CRG Data <br /> diesel powered. 400 HP (2nd half. 2006) <br />6x4 <br />uck tractor <br />t <br />h <br />hi <br />Truck tractor description , <br />, <br />r <br />g <br />way <br />: Generic on- <br />ooseneck drop deck equipment trailer (25T, 50T, and 100T) <br />ldi <br />i <br />f <br />Truck trailer description ng g <br />c <br />o <br />:Gener <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost hour : $16.63 $18.37 $22.33 <br />Orn /)7 <br />Operator c <br />Helper c <br />Total Unit C <br />NON-ROADABLE EQUIPMENT <br />Machine WeighUu <br />Description T (Tons) <br />-Cat D9R - 9SU (2005) 66 73 <br />-Cat 627G 40.90 <br />$27.66 <br />$25.39 <br />Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />$62.35 $125.45 1 $187.80 $12545 $0.00 <br />$55.31 $117.55 3 $518.59 $352.65 $0.00 <br /> I