My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-19_GENERAL DOCUMENTS - M1985112 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1985112
>
2008-08-19_GENERAL DOCUMENTS - M1985112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:36 PM
Creation date
8/22/2008 10:08:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
8/19/2008
Doc Name
Complaint
From
Taylor Construction
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A dbI R Well Service, Inc. <br />Allen Robbins- President <br />25269 WCR 50 <br />Kersey, CO 80644 <br />Ph: 970-284-0255 <br />QUOTATION <br />Date: August 13, 2008 Job Description: Drilling Well <br />Name: Jim Taylor Expires: October 11, 2008 <br />Address: 665 Balsam Ave. City, State, Zip: Greeley, CO 80631 <br />QTy __ DESCRIPTION UNIT PRICE TOTAL_ <br />1 Mobilization & De-mobilization & set up fee 1,500.00 <br />60' Drilling 1,170.00 <br />20' 6 5/8 Steel Casing $14.96 385.00 <br />1 6 Steel to 5" PVC Adp 39.60 <br />20' Cement Job min. required 275.00 <br />40' 5" PVC Plain Casing 5.89 235.60 <br />20' 5" PVC Perforated Casing 7.76 155.20 <br />1 5" PVC Bottom Cap 22.62 <br />40 #8 Gravel 250.00 <br />1 6 5/8 Well Seal 56.27 <br />4hr Development 800.00 <br /> Any additional Development needed will be billed @ 150.00 hr <br /> Fuel Surcharge 320.40 <br /> Subtotal 5209.29 <br /> Tax 41.15 <br /> Freight <br /> Total 5250.44 <br />Please note this is a quotation, quantity and materials may vary due to unforeseen circumstances. <br />Additional cost will be billed at above listed prices; if additional materials are not listed it will be billed at cost for <br />quantities used. <br />I understand that 50% of estimated total is expected down before work commences, and balance due upon completion. <br />Upon signing I accept this quotation and its'terms and conditions. <br />Signature and Title <br />Date
The URL can be used to link to this page
Your browser does not support the video tag.