My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 8/19/2008, 9:28:24 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 8/19/2008, 9:28:24 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:41 PM
Creation date
8/19/2008 3:31:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008055
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2008
Doc Name
New NOI Application (non-confidential)
From
Lynx E&M LLC
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Form 2 - Public) <br />6 <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil is minimal - ranging from one to 4 inches in thickness. <br />Any topsoil removed from the 10'X10' pit will be salvaged <br />and placed in a bank adjacent to the pit. After the pit is <br />backfilled, the topsoil will be redistributed over the pit to the <br />approximate same thickness. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />-Holes are expected to be dry <br />After completion, all dry holes will be abandoned by filling <br />the drillhole with a mixture of water, Kwik Plug 3/8" chips, and <br />Superplug 80%-90% bentonite to completely fill the hole. <br />No more than 3 -holes will be open at any one time. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />None <br />6, describe how roads will be reclaimed or returned to their pre prospecting (or better) condition: <br />NA <br />_._.......... -._......... _._.,..-._....... ...... -__ ........... ....... _ .... _...... .......... --- -._......_.._.._....-.._._..........._.._..........._........._.._................._........_ <br />_......._.._._.........._.._.._.........._............_.._._.... <br />All drill sites are accessible from existing roads.
The URL can be used to link to this page
Your browser does not support the video tag.