Laserfiche WebLink
Design Criteria <br />c <br />18. Road construction plans would identify specific locations Road Use <br />of drainage features and BMPs for approval by the FS Permit (FSM <br />engineer/permit administratorlprior to construction. 2733.04b <br /> and FSM <br /> 7730), <br /> Forest <br /> Service <br /> Roads Policy <br />19. Road design packages will be submitted to the FS for Forest Plan <br />approval prior to any construction activity. Roads open to <br />the public (Levels 3,4 & 5) will require written approval <br />prior to any construction activity. <br />20. Project access roads will be gated and closed year-round RACR <br />to the general public. Personnel with access will be <br />monitored to insure such access is not abused; i.e., no <br />access during non-working hours for purposes unrelated <br />to the project such as hunting or off goading. <br />21. All new access roads constructed for the sole use of this RACR, 36 <br />project will be decommissioned by full obliteration when CFR 228 E, <br />no longer needed for the project and reclaimed. Road Use <br /> <br />Permit (FSM • <br /> 2733.04b <br /> and FSM <br /> 7730) <br />22. Road work will be performed only upon authorization of Road Use <br />the District Ranger and comply with the terms of MCC's Permit (FSM <br />Road Use Permit. Roads will be designed and constructed 2733.04b <br />to provide maximum stability and protect the surface and FSM <br />resource. Best Management Practices will be used in 7730), MCC <br />designing the roads and during construction. All roads Project Plan <br />will be upgraded or constructed to USFS specified <br />standards for either temporary or classified roads, as <br />appropriate and approved by the USFS, with a design <br />speed of 15 miles per hour. <br />23. Surface disturbance will be minimized to the extent Forest Plan, <br />reasonably feasible in order to limit potential impacts. 36 CFR 228 <br />Soil that is removed from all new disturbance areas will E, MCC <br />be windrowed or stockpiled for use in reclamation. Project Plan, <br />Topsoil will be segregated from subsoil and stored at a Road Use <br />depth no greater than that prescribed by the Paonia Permit(FSM <br />District Ranger. No soil generated from excavation, slide 2733.04b <br />removal or other operations shall be deposited within the and FSM <br />WIZ of any drainage with flowing water. <br />7730), • <br /> WCPH (FSH <br />Action •