My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-11_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-08-11_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:24 PM
Creation date
8/18/2008 2:33:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/11/2008
Doc Name
Drainage Enhancement
From
CC&V
To
DRMS
Type & Sequence
TR47
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mr, Mark Vanoni <br />Sr. Environmental Coordinator <br />Phase 4 Drainage Enhancements amec-v <br />Project 8420119300 <br />August 11, 2008 <br />As with any work on or near the VLF, extreme care must be taken to avoid damaging the <br />geomembrane liner and solution collection piping network. It is recommended that all machine <br />excavation work be limited to the upper 12 inches of the existing DCF surface. A spotter should <br />be used to observe and guide the operator of the excavation equipment. Hand methods should be <br />used to excavate below 12 inches. <br />In addition, equipment tracking the surface of the DCF should not be allowed to pivot on one <br />track (i.e., no abrupt or sharp turns). The recommended maximum ground pressure for track <br />equipment on the DCF surface is 8.7 psi (low ground pressure). Rubber tired equipment should not <br />be allowed to track on the DCF surface. <br />AMEC appreciates this opportunity to assist CC&V on this project. Please contact me if you <br />have any questions or comments at (303) 433 - 0262. <br />Sincerely, <br />AMEC Earth & Environmental, Inc. <br /> <br />John F. Lupo, Ph.D., P.E. <br />Principal Engineer <br />JFL:dg <br />SAPROJECTMI M cc&v gold mhdng phase 4 drainageW - deslgnWase 4 drainage letter doc <br />ra
The URL can be used to link to this page
Your browser does not support the video tag.