My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-15_PERMIT FILE - M2008006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008006
>
2008-08-15_PERMIT FILE - M2008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:32 PM
Creation date
8/18/2008 2:29:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008006
IBM Index Class Name
PERMIT FILE
Doc Date
8/15/2008
Doc Name
Second Adequacy Review Letter Response
From
Applegate Group, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Peter Hays .. <br />:Re: Set . er Pit, Adequacy Letter Response <br />. <br />August 15,2008 <br />Pdge S. of 6.: <br />-In an effort to address the particular lnterests.of the. cottonivood trees located.along the <br />site, the triggerpoint i.d tit fed in the monitoringplan will be used (see number 7 above). <br />In addition to the above, Connell. Resources, Inc..; is ivilling to relocate,the settlingponds <br />to. the southtivestern area within the 100',setback fi oin. the top of the :riverbank iii order to .. . <br />vood grove. <br />increase the 1?otentialfor g'oi?nd?yater recharge near the cotton <br />. . <br />:10.:Please commit, to. provide the Division a copy of the discharge .permit prior lo. discharge <br />to the:Cache la Foudre River.: . <br />Connell Resources; Inc. will: provide . the Division of Reclamation Mining and Safety. a <br />copy of the discharge permit Prior to discharge into the Cache la Poudre River: <br />11. The' Division did not. receive -cross sections A and B and section C. appears .to be. <br />incomplete within Attachnxent F: Cross Sections for the SerFer-Pit Floodplain Permit and <br />Report. Please provide cross sections. A. B, and C.. <br />The analyses and cross :sections for the `Set•Fe?•.Pit. Floodplain Permit. were provided in . <br />the Floodplain Developrrient"Permit and Report. The HEC-2 model for Table 1: Effective <br />:VS, Txisting Conditions, Table.2 Existing vs. Proposed Conditions, and Attachment E all <br />relate to-cross.sections.:C, D, and E on the Floodplain Workmap,. <br />- <br />The t•eport included, t?vo maps; the FIRM naap,.and the Floodplain. Wot•kinap; Cross <br />sections A C, and D., on the. FIRM Map are, identif ell. as cross section C, . D, and E <br />(respectively) on the Floodplain Wotkmap. As. a result, the cross-sections in Attachment <br />' Fshould correspond to the cross-sections'identiftied on the Floodplain Worbheip.. <br />Rule 6.4.12 Exhibit L- Reclamation Costs <br />:12- The Division prepared a., reclamation cost .estimate for the SerFer. Pit:.. The, Division <br />estimates that the.total cost to reclaim:the site:it.. $328,445. A copy of.tlte. estimate'is <br />enclosed for your.review::. <br />Connell Resources, Inc. agrees with the above stated reclamation cost estimate.: . <br />Rule 6 .4.19 Exhibit S - Permanent manmade Structures <br />13..In [the] adequacy response letter dated July. 9. 2008, the applicant states "An agreement: <br />with Poudre Valley. REA will. be in place prior to removal of power lines, the applicant <br />did not.address the utility boxes owned by Poudre Valley REA in the adequacy response <br />Please clarify the issue, <br />A slope stability analysis ivas petformed for. the. SerFer Pit Regular 112 Operation <br />Reclamation . Permit and submitted with. the application in January, 2008. .:This <br />evaluation, demonstrates that the utility boxes,: as well as all stt uctureS itilithin.,200 feet 9f.
The URL can be used to link to this page
Your browser does not support the video tag.