Laserfiche WebLink
Total annual depletions from the gravel mining operations are estimated to be 9.23 acre-feet per year <br />during the mining phase. <br />After reclamation, approximately 65.7acres of water surface will experience an annual evaporation of <br />40 inches. This is the equivalent of 219 acre feet per year. <br />L_J <br />White River City Pit, August 08 G-5