Laserfiche WebLink
......... <br />.:: _ <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $55.22 1 $55.22 $55.22 <br />-Light Duty Pickup, 4x4, 314 T. $33.47 1 $33.47 $33.47 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $88.69 $88.69 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 1.50 <br />Return time (hours) = 1.50 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 4.00 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />1.50 Total non-roadable mob/demob cost <br />1.50 * two round trips with haul rig <br />NA Total roadable mob/demob cost ** <br />NA ** one round trip, no haul rig <br />3.00 <br />Grand Junction <br />60.0 miles <br />40.0 mph <br />$2,701.90 <br />$266.07 <br />JOB TIME AND COST Total job time : 8.00 hours <br />Total job cost : $2,968