Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 15-Aug-2008 Permit or job no. M-2008-050 Site: October Ore Pile <br />User : GRM <br />Abbreviation <br />Filename <br />none <br />M050-000 <br />State :Colorado <br />County :Mesa <br />Agency or organization name : DRMS <br />Permit or job action : Final Reclamation Liability Estimate- no additional topsoil required <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -removal and disposal of silt fencing demolish 1 3.0 $1,10_9 <br />_ <br />02a -rip 0.46 acres of footprint and compacted areas ripper 1 0.8 $120 <br />03a -push topsoil salvaged over 0.11 acres dozer 1 0.24 $32 <br /> <br /> <br />05a -reveg of 0.46 acres revege 1 8.0 $802 <br />06a -initial mobilization to site mobilize 5 8.0 $2,968 <br />07a -secondary reclamation mobilization (seeding, weed control, erosion) mobilize 2 6.8 $735 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 26.9 $5,766 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =L $5,766 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability insurance : 2.02 % of direct total = $116 <br />Performance bond : 1.05 % of direct total = $61 <br />Job superintendent : NA* NA NA total = _ NA <br />Profit : 10.00 % of direct total = $577 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $754 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $6,520 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total= _ NA <br />Reclamation management and/or administration : 5:00 % of cntr. NA total = $326 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $1,580 <br />TOTAL BOND AMOUNT (direct + indirect) _ $7,346