Laserfiche WebLink
.... <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $55.22 1 $55.22 $55.22 <br />-Light Duty Pickup, 4x4, 314 T. $33.47 1 $33.47 $33.47 <br />-Generic 12-18 cy, 6x4 $85.18 4 $340.70 $340.70 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $429.39 $429.39 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 60.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.50 1.50 Total non-roadable mob/demob cost $2,701.90 <br />Return time (hours) = 1.50 1.50 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost `* : $1,288.18 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 4.00 3.00 <br />JOB TIME AND COST Total job time : 8.00 hours <br />Total job cost : $3,990