My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-30_REVISION - M1987038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987038
>
2008-07-30_REVISION - M1987038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:45:56 PM
Creation date
8/14/2008 4:04:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987038
IBM Index Class Name
REVISION
Doc Date
7/30/2008
Doc Name
Witness & Exhibit list
From
Oldcastle SW Group dba Four Corners
To
DRMS
Type & Sequence
AM5
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bright pretted the Staff Repnrt to the CarT? sioners dated Deceml'? 22, <br />1992 and a call up requ etter received December 11, 1992 [rom Jim and Sandy Friedley. <br />3 (FilmCR --1,3 est) The Planning Commission recommends approval of this project <br />with the following conditions: <br />1. That all construction shall meet the required <br />6 standards of the La Plata County Permit System and the <br />La Plata County Floodplain Management Regulations. <br />2. That all verbal, written and graphic representations <br />9 of the applicant, his agents or representatives are <br />deemed conditions of approval. <br />3. That the duration of this approval shall be for the <br />12 period of three years as specified by Article 69 of <br />title 24, C.R.S. as amended and as specified in <br />Section 7.7 Land Use Permit Requirements and <br />15 Enforcanent, B. Time Limit on Approvals/Vested <br />Property Rights. <br />4. A Road Impact Agreement shall be presented and <br />18 approved by the Board of CotmLy Commissioners prior to <br />issuance of the land use permit. <br />5. All requirements of the County Engineer shall be met <br />21 prior to the issuance of the land use permit. <br />6. The landscaping shall be installed according 1o the <br />landscape plan suLimitted by the applicant and shall be <br />24 completed for Phase I within 6 months of approval of <br />the land use permit. For the reminder of the phases, <br />the landscaping shall be completed prior to initiating <br />27 excavation on each phase. <br />7. Mininium sizes of plants specified in the landscaping <br />plan shall be 2" caliper for large trees and 5 gallon <br />30 for small trees and shrubs. <br />8. Landscaping shall be maintained and replaced as <br />necessary. <br />33 9. Dust shall be controlled on roads and crusher during <br />operating hours. <br />10. Hours of operation shall be limited to Mondays through <br />36 Saturdays except when an extraordinary and iniusual <br />hardship condition exists. <br />11. That the Planning Comnission recommends to the Road <br />39 and Bridge Department that a speed limit of 45 MPH be <br />posted on the Buck Highway for a distance of 1 mile <br />both directions from the applicants access point and <br />42 that accel and decel lanes be provided according to <br />the approval of the La Plata County Road and Bridge <br />Department. <br />December 22, 1992 4 <br />Hearing on Permit No. M-1987-038 <br />Bayfield Pit No. 1 <br />SUIT00056
The URL can be used to link to this page
Your browser does not support the video tag.