My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-12_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-08-12_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:27 PM
Creation date
8/13/2008 1:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
8/12/2008
Doc Name
Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR88
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br />.:. <br />MATERIAL QUANTITIES ...:::.:..:......:.................................. <br />Initial Swell Loose <br />volume : 4,300 B CY factor : 1.250 volume : 5,375 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br /> <br />_...<: <br />HOURLY PRODUCTION :.:: <br />..:.<: <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.41 <br />Weight description : <br />Earth - Dry packed Adjusted unit production : 504.38 LCY/hr <br /> Adjusted fleet production : 504.38 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 10.66 Hours <br />Unit cost : $0.411 /LCY Total job cost : $2,212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.