Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a State : Colorado Permit/job# : M-1987-074 <br />Date <br />User <br />08/05/2008 <br />THM <br />County :Eagle <br />Site :Dotsero Quarry <br />Abbreviation :none <br />Filename :M074-03a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation cost Update <br />Task description :Regrade quarry floor <br /> <br />HOURLY EQUIPMENT COST <br />1 <br />310 <br />Basic machine : Cat D8R Series 11- 8SU (200, Horsepower : <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> <br />E <br />$77.13 <br />Operating cost/hour : <br /> <br />100 <br />Ripper op. cost/hour : $0.67 10 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $167.70 Tota l fleet cost/hour : $167.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,813 LCY factor : NA volume : 25,813 LCY <br />f ted volume Assume 8 acres graded at 2 feet/acre <br />; ma <br />Source o e <br />Source of estimated swell factor : NA - - <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> operator skill : vg.) <br /> 50 feet Material consistency : at HB) <br />Average push distance : <br /> <br />0 <br />400 <br />1 <br />LCY/hr <br />Dozing method : <br />gen.) <br />en <br />Unadjusted hourly production : . <br />, <br /> Visibility : avg.) <br />Material consistency description : Job efficiency : W ift/day) <br />Consolidated stockpile Spoil pile: nd-rf) <br /> Push gradient at HB) <br /> 00 <br />0 % (ne <br />) Altitude at HB) <br />Average push gradient : . g at HB) <br /> 200 <br />7 feet Material weight <br /> <br />erage site altitude <br />Av <br />, (SISUIU) <br /> <br />) <br />/SU/U) <br /> Blade type <br />ht <br />i 950 Ibs/LCY Net correction : 1.20 <br />: <br />g <br />Material we <br />Weight description <br />Adjusted unit production : <br />1685.55 <br />LCY/hr <br />Cinders <br /> Adjusted fleet production : 1,685.55 LCY/hr <br /> <br />JOB TIME AND COST <br />) <br />D <br />Total job time : <br />15.31 <br />Hours <br />Fleet size : 1 ozer(s <br />Unit cost : 099 <br />$0 /LCY Total job cost : $2,568 <br /> . -+