Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 10a State :Colorado Permit/job #:M-1987-074 <br />Date : 0810512008 County : Eagle Abbreviation :none <br />User: THM Site :Dotsero Quarry Filename :M074-10a <br />Permit or other job action :Final Reclamation Cost Update <br />Task description : Mobilization to and from site <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />rvvi'I-RVAV/1oL.G c !d .? <br />Machine <br />Description <br />-Cat D8R Series 11 - 8SU (20 <br />-CAT 966G (2002) <br />-Revegetation Equipment . <br />Weight/unit <br />(Tons) <br />52.55 <br />25.10 <br />20.00 <br />Ownership <br />Cost/hr/unit <br />$50.32 <br />$29.49 <br />$20.00 <br />Haul Rig <br />Cost/hr/unit <br />$125.45 <br />$117.55 <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />1 <br />2 <br />Haul Trip <br />Cost/hr/fleet <br />$175.77 <br />$147.04 <br />$217.34 <br />Return Trip <br />Cost/hr/fleet <br />$125.45 <br />$117.55 <br />$177.34 <br />DOT permit <br />CosUfleet <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $540.15 $420.34 $0.00