My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-04_PERMIT FILE - M2008009
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008009
>
2008-08-04_PERMIT FILE - M2008009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:11 PM
Creation date
8/12/2008 2:56:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008009
IBM Index Class Name
PERMIT FILE
Doc Date
8/4/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
3B Enterprises, LLC
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task #: 06a State :Colorado Permit/job # M-2008-009 <br />Date : 0810512008 County :Moffat Abbreviation :none <br />User : THM Site :LysterPit Filename :M009-06a <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Initial mobilization to and from site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer. (25T, 50T, and 100 T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series ll - 7SU 35.17 $41.70 $117.55 1 $159.25 $117.55 $0.00 <br />-CAT 950G (2002) 19.52 $21.07 $88.67 1 $109.74 $88.67 $0.00 <br />-CAT 14H 20.70 $39.60 $88.67 1 $128.27 $88.67 $0.00 <br />-Revegetation Tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $505.94 $383.56 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.