Laserfiche WebLink
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task # : 04a State :Colorado Permit/job # : M-2008-009 <br />Date : 0810512008 County :Moffat Abbreviation :none <br />User : THM Site :Lyster Pit Filename :M009-04a <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Spread 8" of topsoil over 19 acres <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H <br />Horsepower: 215 <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown Ownership cost/hour : $43.20 NA <br />Grader operating cost/hour : $48.51 100 <br />Ripper operating cost/hour : $0.78 25 <br />Operator cost/hour : $24.47 NA <br />Total unit cost/hour : $116.96 Total fleet cost/hour : $116.96 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 19.00 acres <br />Source of estimated acreage :Reclamation plan and Map <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet ** <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />` at 0 degrees, blade is perpendicular <br />to direction of travel. <br />** width of ripper beam on ripping applications <br />Job Condition Correction Factors <br />Average site altitude : 6,200 feet Altitude adjustment factor <br />Job efficiency adjustment factor <br />Net job correction <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) <br />Source <br />1.00 (Cat HB) <br />0.85 (1 sh/d, mod.) <br />0.8500 multiplier <br />Total job time : 14.61 hours <br />Unit cost : $89.91 per acre Total job cost : $1,708