CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 01a State : Colorado Permit/job #: M-2008-009 <br />Date : 0810512008 County : Moffat Abbreviation :none <br />User : THM Site : Lyster Pit Filename : M009-01a <br /> <br />Agency or organization name : DBMS <br />Permit or other job action : Final Rclamation Cost Estimate <br />Task description :Distribute overburden throughout pit area <br />HOURLY EQUIPMENT COST Basic machine : CAT 950G (2002) Horsepower : 180 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $21.07 NA <br />Operating cost/hour : $30.76 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $84.61 Total fleet cosUhour : $84.61 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 12,906 CCY factor: 1.125 volume: 14,519 LCY <br />Source of quantity take-off : Mine Plan and Staff Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material up to 118" diameter 0.020 (Cat HB) <br />Stockpile : Dumped by truck 0.020 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HS) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment : -u.u4u minutes <br />Adjusted basic cycle time : 0.510 minutes <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 700 0.00 5.00 5.00 0.6389 (Cat HB) <br />Return route : 700 0.00 5.00 5.00 0.5560 (Cat HB) <br /> Total travel time 1.194y minutes <br />Loader Bucket Capacity Total cycle time : 1.705 minutes <br />Rated capacity : 3.75 LCY (heaped) <br />Bucket fill factor : 0.975 Loose material - mixed moist aggregates (95-100%) <br />Adjusted capacity : 3.66 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 6,200 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 128.67 LCY/Hr <br />Adjusted hourly unit production : 106.80 LCY/Hr <br />Adjusted hourly fleet production : 106.80 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 135.95 Hours <br />Unit cost : $0.792 /LCY Total job cost : $11,503