Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Depth of the topsoil is shallow (0:6 inches deep). Topsoil will not be salvaged due to sr-? <br />,I > <br />the £,mis.>r. Vi 2r: cF 'f/.,?. <•'?i'7"?c r %Jh-r? i-- <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): J <br />k in .-x 4--. 1? irr? i? a 7= u/U 1l It ? /Zit&g2 ?4?` .,rt-u_;, 'a-T a-e <br />j~t, e i -t e c -3 n li'1 h ?i?-?f Y -n 2-e Ir?l C? 3 .z i /t T/ 3 X/L/ `J'/l o f <br />`T I-A <br />iA- -4t' J'cr,fVr• <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reglamation performance standards). You may wish to contact the Division for closure specifications. <br />6. Describe how roads will be. reclaimed or returned to their pre-prospecting (or better) condition: <br />jJC