Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :AM-Ol Bond <br />Task description : Backlill De <br />HOURLY EQUIPMENT COST <br />Trench <br />Basic machine : Cat D8R Series 11- 8SU (2001 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shiftbasis : 1 perday <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> <br />M.: Total unit cost/hour : $167.03 Total fleet cost/hour : $334.06 <br /> <br />MATE R I ::....:............................................... <br />AL QUANTITIES <br />........................................................ <br />..............................................:..................... X <br />............................... <br />........................... <br />Initial Swell Loose <br />volume : 2,900 LCY factor : NA volume : 2,900 LCY <br />Source of estimated volume : drms <br />Source of estimated swell factor : NA <br />>,. <br />-xi <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.45 <br />Weight description : <br />Earth - Dry packed <br />Adjusted unit production : 220.87 LCY/hr <br />Adjusted fleet production : 441.74 LCY/hr <br />_ ..... ......... .......... _.. .............:::.... <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 6.56 Hours <br />Unit cost : $0.756 /LCY Total job cost : $2,193