My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-06_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2008-08-06_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:15 PM
Creation date
8/11/2008 9:34:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
8/6/2008
Doc Name
Midterm Review Reclamation Cost Estimate
From
DRMS
To
Seneca Coal Company
Type & Sequence
MT5
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : sheet 2 of 2 <br />Scraper Nayioad (weight) Basis : <br />Material weight : <br />Material description : <br />Earth - Loam <br />2,100 pounds/LCY <br />Rated payload 75,000 pounds <br />Payload capacity: 35.71 LCY <br />Bowl (volume) Basis : <br />Struck volume : 21.00 LCY <br />Heaped volume : <br />i 31.00 LCY <br />I Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "~• <br />- hourly production reflects volume per scraper pair on push-cull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 8,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.:; 0.980 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency 0.830 NA (Cat HS) <br />' load time per scraper pair on push-pull models Net correction 0.813 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) ' Roll. res. (% ) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 ! 300 5.00 ! 3.00 8.00 1131 i 0 31 <br />minutes <br />rravei erne Tor earn segment is adjusted for accelerationtdeceleration. Return time <br />table velocities are max. attainable per total resistants shown, -rot average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 1,521.57 LCY/hour'** Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />.......................... . <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.15 <br />minutes <br />2.05 minutes <br />1,237.65 <br />- 23 LCY/hour <br />2 scraper(s) <br />1237.65 LCY/hour <br />2,475.29 LCY/hour <br />Haul time : 0.31 <br />Return route :
The URL can be used to link to this page
Your browser does not support the video tag.