Laserfiche WebLink
HOURLY PRODUCTION <br />Hauling Capacity : sheet 2 of 2 <br />Basis : <br />Scraper Bowl (volume) Basis : <br />Material weight:- 2,100 pounds/LCY <br />Material description -- <br />Earth - Loam <br />Rated payload : 75,000 pounds <br />Payload capacity: 35.71 LCY <br />Cycle Time : <br />Scraper loading time 1.00 minutes <br />Maneuver and spread time: 0.60 minutes <br />load time per scraper pair on push-pull models <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity: 29.00 LCY <br />- hourly production reflects volume per scraper pair on push-pull models <br />Job Condition Corrections : Site altitude ft): 8,000 <br /> Scraper Push dozer Source <br />Altitude adj. 0.980 <br />......... NA <br />.. <br />_. (Cat HS) <br /> <br />Job efficiency:; <br /> <br />0.830 <br />__ - <br /> <br />NA -- <br /> <br />(Cat HS) <br />Net correction i <br />0.813 NA --?- <br />Travel time : <br />Road condition description :Finn, smooth, rolling, dir&lt. surfaced, watered, maintained <br />Haul Route : ------ --------.._......---- <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)*" <br />1 600 -2,00 ; 3.00 i 1.00 2952 i 0.40 <br />Return route : <br />Haul time : 0.40 <br />?.u. •., - -- -w-v- is autusteo yr acceteranon!aaca_leration. Return time <br />table velocities are max. attainable per total resistance shown. not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour. 1,447.89 LCY/hour Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />0.40 <br />minutes <br />minutes <br />2.40 minutes <br />._....-.__. ......... <br />1,177.71 ..... <br />LCY/hour <br />2 scraper(s) <br />1,177.71 LCY/hour <br />2,355.42 LCY/hour