Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 041 State : Colorado Permitfjob# : C-1982.057 <br />Date : w 08/0512008 - County:Routt Abbreviation :none <br />User : _ <br />Site :Seneca ii-W Filename : C057-041 ----^.--?- <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2008 Midterm Review <br />Task description : Regrade Pond 016 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade <br />type :Semi-U <br />niversal <br />---------.....---- <br /> _ <br />_ <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 pe <br />rday <br /> Attachment no. 2:3-shank ripper _ <br />- - <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating costihour : $103.27 100 <br /> Ripper op. costihour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: --_" ^-10,000 -_" - CCY factor : - 1.125 volume : 11,250 LCY <br />Source of estimated volume :Page 25-1-27 <br />Source of estimated swell factor :CAT Handbook ""--"-- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> j Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat NB) <br />Unadjusted hourly <br />production : <br />910.5 LCY/hr <br />Dozing method : 1,00 <br /> <br />? (gen.) <br /> Visibility: 1,00 (avg ) <br />Material consistency description Job efficiency : 0.83 . <br />(lshitt/day) <br />Compacted fill or embankment <br />- ----...... _.,.__..-- <br />_-_.- Spoil pile : -- <br />0.80 I - - -- <br />`(fnd rf) <br /> Push Cat HB) <br />Average push gradient : i <br />0.00 % (Pos) <br />Altitude .... <br />1,00 _.._ <br />(Cat HB) <br />Average site altitude <br />Material weight : <br />O87 <br />(Cat ti8) <br /> Blade type : 1.00 (SlSU/U) <br />Material weight : 2,650 Ibs/LCY --------- <br />Net correction : -------------........_..-_ <br />0.39 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : <br />-, 354.06 LCYIhr <br /> Adjusted fleet production : 354.06 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 31.77 Hours <br />Unit cost : $0,586 /LCY Total job cost : " $'6,594