Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 039 State : Colorado Permitrjob# : C-1982-057 <br />Date : 0810512008 County Routt - -~ `-- - - --- - .-- - <br />? Abbreviation :none <br />User : JRS ------- - .-----...-..? <br />Site : Seneca li-W Filename : C057-039 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2008 Midterm Review <br />Task description :Regtade Pond 009 -?-- <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal -- -- <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2:'j sW nk ripper ^---`"- <br /> Data source: (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour - $71.49 <br />NA <br /> Operating cost/hour : <br />- _ <br />$103.27 100 <br /> Ripper op. cost/hour : - $0-00 <br />--- -- -- - 0 <br />i <br /> <br />Operator cost/hour : _ <br />------..__...- <br />--- <br />$32.78 NA <br /> <br />Total unit cost/hour : _---_-_..---. <br />$207.53 Total <br />fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 CCY factor : 1,125 volume : 11,250 LCY <br />Source of estima ted volume :Page 25-1-27 <br />Source of estimated swell factor :CAT Handbook - - -- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : <br /> <br />j 150 feet --- <br />Material consistency : --- - - - <br />0.90 - <br />(Cat HS) <br />Unad <br />usted hour) <br />1 y production : <br />910.5 LCY/hr <br />Dozing method : <br />1.00 <br />j (gen.) <br /> <br /> <br />Material consistency description <br /> <br />: <br />? Visibility: 1.00 <br /> <br />- <br />(avg ) <br /> <br />_ <br />- - - <br />-- <br /> <br />Compacted fill or embankment Job efficiency 0 83 (ishif <br />/da <br />_r}. <br />_ <br /> Spoil pile - 0.80 <br />- (fnd ro <br /> <br />Push gradient : <br />100 -. -- <br />(Cat HB) <br />Avers <br />ge pus gradient : <br />0.00 % (POs) <br />Attitude : <br />100 <br />(Cal HB) <br />Average site altitude : 7.500 feet <br />Material weight : <br />0.87. -- <br />(C"W) <br /> Blade type : 1.00 (S/SUA)) <br />Material weight : 2,650 Ibs/LCY Net correction --- -___---------_ ----- -- ------------ ----------- <br />Weight descri lion - - - - <br />P . <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : i Dozer(s) <br />Unit cost : $0.586 /LCY <br />Adjusted unit production : 354.06 LCY/hr <br />Adjusted fleet production : 354,06 Y -LCY/hr <br />Total job time <br />Total job cost <br />31.77 Hours <br />$6,594