Laserfiche WebLink
CIRCES Cost Estimatina Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task #: _- _ 027 State : Colorado Permitijob C-1982-057_ <br />Oate : - 08/0512008 County :Routt Abbreviation :none <br />User:--- <br />ser : JRS - - Site : Seneca li-W -_ ?- Filename : C057-027 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2008 Midterm Review <br />Task description : Grade Permanent Roads to Blend <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H Horsepower : 215 <br />Attachment no. 1 :NA Shift basis : 1 per day <br />Attachment no. 2 : Matti-shank ripper <br />Data source : (CRG) <br />Cost Breakdown Ownership cost/hour : <br />Grader operating cost/hour <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 55.80 i <br />Utilization % <br />$43.20 NA <br />$48.51 100 <br />$0, 00 0 <br />$24.47 NA <br />---._.-_-__----_...- <br />$116.18 Total fleet cost/hour : $116.18 <br />rcres <br />Source of estimated acreage :Page 25-1-21 <br />HOURLY PRODUCTION <br />Selected application : Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 _ degrees * 'at 0 degrees, blade is perpendicular <br />Effective blade length 12,10 feet to direction or travel. <br />Width of blade overlap per pass : <br />2.00 _ <br />feet <br />_ <br />Net grading or ripping width per pass : 10.10 _ <br />feet width of ripper beam on ripping applica <br />_ tions <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />JJQb Condition Correction Factors Source <br />Average site altitude : 7, 500_ feet Attitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : <br />_---- 0.85 <br />------ -------------- (1sh1d, mad.) <br />-- <br />----- -' <br /> Net job correction : 0.8500 multiplier <br />- -- <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1,3008 acres/hour <br />JOB TIME AND COST . <br />Fleet size 1 grader(s) Total job time : 42.90 hours <br />$4,984